12A और 80G पंजीकृतदान पर कर लाभ+91 92264 92263
कंपनीMetals & Mining

Jindal Steel & Power Limited: CSR spending FY 2021-22 to 2025-26

Jindal Steel & Power Limited spent ₹1,032.3 crore on CSR from FY 2021-22 to 2025-26 (standalone company, from its annual reports), shown year by year with the money set aside for ongoing projects.

यह लेख अंग्रेज़ी में उपलब्ध है।

परिचय

Jindal Steel & Power Limited is a private Indian company. Industry: Steel, power and mining. It is listed on the NSE (symbol JINDALSTEL) and the BSE (code 532286). Group CSR foundation: Jindal Foundation (earlier JSP Foundation).

Figures are for the standalone company Jindal Steel & Power Limited, in INR crore, from its own annual reports. Five-year total spent, FY 2021-22 to 2025-26: ₹1,032.3 crore. By five-year spend it ranks 17 of the 50 companies in this section.

Quick answers

How much did Jindal Steel & Power Limited spend on CSR in FY 2025-26?

In FY 2025-26 Jindal Steel & Power spent ₹175.84 crore on CSR against a 2% obligation of ₹133.74 crore; the largest area was healthcare (₹67.21 crore).

How much did Jindal Steel & Power Limited spend on CSR in the five years FY 2021-22 to 2025-26?

₹1,032.3 crore in total (standalone company, from its annual reports); the most was in FY 2024-25 (₹267.42 crore).

Which area got the most CSR money from Jindal Steel & Power Limited?

In FY 2025-26, the latest year with a split by area: Health & Nutrition (i), with ₹67.21 crore of the ₹175.84 crore spent that year.

In which states did Jindal Steel & Power Limited spend its CSR money?

The FY 2025-26 sources name Odisha, Chhattisgarh, Jharkhand, Haryana, Gujarat, Delhi, Bihar and Rajasthan.

Which foundation or agency runs the CSR projects of Jindal Steel & Power Limited?

Its group CSR foundation is Jindal Foundation (earlier JSP Foundation). Implementing agencies named for FY 2025-26: Jindal Foundation, LEPRA, LV Prasad Eye Institute, Jindal Education & Welfare Society (JEWS) Raigarh/Barbil, OP Jindal University (OPJU) and 11 more.

Did Jindal Steel & Power Limited set CSR money aside for ongoing projects?

No: none of the years with a figure shows money moved to the Unspent CSR Account for ongoing projects.

Jindal Steel & Power Limited: CSR spending FY 2021-22 to 2025-26

स्रोत: Integrated Report 2025-26 (Board's report CSR annexure; Note 42) – Jindal Steel & Power Limited; Integrated Report 2024-25 – Jindal Steel & Power Limited; Integrated Annual Report 2023-24 (BSE filing) – Jindal Steel & Power Limited; Integrated Annual Report 2022-23 – Jindal Steel & Power Limited

GreenEye के साथ अपनी कंपनी के CSR वृक्षारोपण की योजना बनाएँ

GreenEye Foundation (GEYE INNOVATION FOUNDATION) एक सेक्शन 8 गैर-लाभकारी संस्था है, जो CSR के लिए पंजीकृत है (CSR-1 पंजीकरण CSR00881842), और इसके पास 12AB और 80G पंजीकरण है। कंपनियाँ GreenEye के साथ वृक्षारोपण के लिए धन दे सकती हैं और हर पेड़ के लिए जियोटैग की गई तस्वीरें, एक ट्रैकिंग लिंक और एक प्रमाणपत्र पाती हैं।

हमसे बात करें
कंपनी CSR में सभी